Municipal Stormwater Management Policies and Guidelines

Screen Shot 2019-07-06 at 7.15.16 PM.png

City of Barrie Storm Drainage and Stormwater Management Policies and Design Criteria: Valdor Engineering Inc. was retained by the City of Barrie to update their SWM policies and design criteria.  This project included a comprehensive document review and liaison with representatives from the LSRCA, NVCA, Barrie Land Developers Association, Greater Barrie Builders Association and various City departments to develop appropriate and cost-effective stormwater policies and guidelines for the City to guide future development.  A final Storm Drainage and Stormwater Management Policies and Design Guidelines document was prepared and submitted to City Council for approval.

City of Pickering Stormwater Management Design Guidelines:  Valdor Engineering Inc. was retained by the City of Pickering to update their SWM design guidelines.  Tasks included a comprehensive document review and liaison with

representatives from the TRCA, developer groups, and various City departments to develop suitable and effective stormwater management guidelines for the City to provide direction regarding future development.  Special consideration was given in preparing the SWM guidelines with respect to low impact development (LID) practices and operation and maintenance issues.

Town of New Tecumseth Engineering Design Criteria and Standard Drawings for Municipal Services for New Development and Capital Projects:  Valdor Engineering Inc. was retained by the Town to work with municipal staff to develop design criteria and design standards to provide a good engineering basis for subdivision design, to establish a uniform criteria of minimum standards, and to improve processing of subdivision plans and agreements in the Town.  Design criteria were established regarding SWM facilities, storm and sanitary drainage systems, water distribution systems, grading control along with the preparation of standard drawings.

Bunkers Crk_ Wellington plaza4.JPG
Flood Hazard Criteria Zones Layout1 (1).
Barrie thundersorm 010.jpg
Barrie SWM Guidelines front page.jpg
Pickering SWM Guidelines front page.jpg
Project Profile - Water Resources